Skip to content
Industrial PartitioningCompanyGet a quote
Menu

Industrial Mesh Partitioning

Mesh is the see-through option. Welded mesh panels bolt to posts fixed to the slab, so you get a secure line you can see straight through, with light and sprinkler water still getting past.

Systems are modular: posts and panels come in a range of heights and widths, with hinged or sliding doors dropped into the run. Prices depend on the layout, so they are set on survey.

Get a quote

Built from
Welded mesh panels on posts
Doors
Hinged or sliding
Price
Set on survey

Where mesh earns its place

  • Stock and tool stores that need locking but not hiding
  • Splitting a hall between tenants or departments
  • Runs beside racking, where anti-collapse panels stop goods falling through
  • Plant you still need to see, such as compressors behind a fence

Not the right choice for: Any wall that has to hold back fire or smoke; Noise, dust or temperature control; Guarding a moving machine, which falls under separate rules.

How a mesh run goes together

A run is set out along a line on the floor, posts are anchored into the concrete and the panels clip or bolt between them. Makers usually offer several panel widths, so the installer fills the run with whole panels and trims the last bay with a narrower one rather than cutting mesh on site.

Doors go in where the posts allow. A hinged door needs a clear swing, so a sliding door is often the better answer beside a busy aisle. Our run planner shows a simple example layout of posts, panels and a sliding door.

Doors in the run are covered by workplace law

Once a door goes into your mesh line, regulation 18 of the Workplace Regulations 1992 applies to it like any other door in the building. A sliding door must have a device that stops it coming off its track, and a door that can be pushed from either side must give a clear view of the space on both sides when it is shut. Open mesh does that naturally; a solid panel door does not.

Think about where people and trucks will meet, too. Regulation 17 asks for traffic routes organised so pedestrians and vehicles can move about safely, and a new mesh line is a good moment to put a pedestrian door away from the forklift opening.

Mesh does nothing for fire separation

Open mesh lets fire and smoke straight through. That is fine for a store inside one open hall, but it means mesh cannot be the wall that keeps a fire compartment or a protected escape route intact.

If the new line sits across an escape route, the escape distances in the hall can change even though the mesh itself does not burn. Under article 9 of the Fire Safety Order the responsible person reviews the fire risk assessment when there is a significant change to the premises, and a new enclosure is often exactly that.

Need the wall to stop fire?

Look at fire rated partitions instead. A fire rating belongs to a tested system, not to open mesh.

What to work out before the installer comes

A tidy brief makes quotes easier to compare. Before the survey, have a rough answer to each of these.

  • The line: a sketch of where the run starts and stops, and any corners.
  • Height: whether it stops at head height or needs to close off to the roof.
  • Doors: how many, and the widest load that has to pass through.
  • A roof: cages for high-value stock often need a mesh lid as well as sides.
  • The lease: whether your landlord has to approve fixings into the slab.

Ask each installer to price the same layout, with doors and any roof listed separately. That is the clearest way to see where two quotes really differ.

From a chalk line to a locked store

  1. Survey

    The installer measures the run, checks the slab and notes racking, pipework and sprinkler heads.

  2. Drawing

    You get a plan showing posts, panel widths and door positions to approve.

  3. Fitting

    Posts are anchored, panels hung and doors set and adjusted, usually around your normal work.

  4. Handover

    Keys, locks and any fixing details your landlord asked for.

Mesh partition questions

Can mesh partitioning be moved later?

Usually, yes. Because the panels bolt to posts anchored in the slab, a run can be taken down and put up again elsewhere, which suits a leased unit. You will be left with anchor holes in the floor to make good.

Does mesh partitioning stop fire?

No. Open mesh gives no fire resistance at all. If the wall has to separate fire compartments or protect an escape route, you need a tested fire resisting system.

Is a mesh cage the same as mesh partitioning?

It is the same kit closed into a box, often with a mesh roof. Our security cages page covers that use.

Will building control need to see it?

Usually when the wall counts as building work, and not otherwise. Under regulation 3 of the Building Regulations 2010 (England and Wales) a "material alteration" is work that would leave the building failing, or failing further, on certain requirements, including structure and the fire rules on escape and internal fire spread. A partition that changes an escape route or a fire compartment can fall into that. Ask building control before you order.

How much does mesh partitioning cost?

We do not quote a rate, because no published installed price per metre exists that we can stand behind. The run length, height, number of doors and any roof drive the figure, so it is priced on survey. Our run planner works out the quantities to give installers.

Get prices for a mesh run

We look for an installer who fits this kind of system near your site and tell you who they are before any of your details go to them. There is no charge to you.

Step 1 of 3
Where is the building?
Get a quote