Steel Partitioning
A solid steel partition gives you what mesh cannot: a wall you cannot see through, that cuts down dust and draughts and makes a proper room out of a corner of the shop floor.
The big choice is single or double skin. Both are priced on survey, because the frame, the doors and the glazing vary so much from job to job.
- Single skin
- Sheet on one face
- Double skin
- Sheet both faces
- Price
- Set on survey
Where solid steel makes sense
- Workshops and maintenance bays you want out of sight
- Dusty processes next to clean packing areas
- Stores where you do not want stock on view
- Site offices on the shop floor, usually double skin
Not the right choice for: A fire separating wall, unless the system is tested and sold as fire rated; Somewhere you need to see straight through at all times.
Single skin or double skin?
A single skin partition has steel sheet fixed to one face of a frame. A double skin partition has sheet on both faces with a cavity, or an infill, in between. The difference shows up in how the wall behaves day to day.
| Single skin | Double skin | |
|---|---|---|
| Faces | Smooth one side, frame visible on the other | Smooth both sides |
| Feel | Lighter, can drum when knocked | Stiffer and more solid |
| Sound and dust | Blocks sight and most dust | Better for noise, as the cavity helps |
| Typical use | Stores, screening, back-of-house areas | Offices, workshops, rooms people work in |
Often the answer is both: double skin round the office or the workshop, single skin along a store wall where nobody sits.
Vision panels and the glazing rule
Steel runs often have glazed panels so supervisors can see in. Regulation 14 of the Workplace Regulations 1992 says that where it is needed for health or safety, a transparent or translucent surface in a wall, partition or door must be of a safety material or protected against breakage, and marked or otherwise made apparent so nobody walks into it.
Doors follow regulation 18: a door that can be pushed from either side needs to give a clear view of the space close to both sides when it is shut. In a solid steel wall, that usually means a vision panel in the door.
Steel is not automatically fire rated
Steel does not burn, but that does not make a steel partition a fire wall. It is not one unless the complete system has been tested and classified for fire resistance and is installed exactly as tested, doors, glazing and fixings included.
If the wall forms part of a fire compartment or an escape route, say so at the start and see our page on fire rated partitions.
Approvals to sort before the order
A solid wall changes a building more than a mesh line does, so check three things before you commit.
- Building control. If the wall changes escape routes or fire separation it may be a material alteration under regulation 3.
- Your fire risk assessment. A new room changes how people get out. The responsible person reviews the assessment after significant changes (article 9).
- The landlord. Your lease may need the landlord’s consent for alterations. Our blog post on the licence for alterations walks through it.
None of this needs to hold the job up for long, but leaving it until the steel is on site can.
How a steel run gets built
Survey and spec
The installer measures, agrees single or double skin for each run, and marks doors and vision panels.
Drawings and approvals
Plans go to you, your landlord and, where needed, building control.
Frame and sheet
The frame is fixed to floor and structure, then the sheet goes on one or both faces.
Doors and finish
Doors hung, glazing fitted and marked, and the run handed over.
Steel partition questions
What is the difference between single and double skin steel partitions?
Single skin has steel sheet on one face of the frame. Double skin has sheet on both faces with a cavity or infill, which makes it stiffer and better at cutting noise and dust.
Is a steel partition fire rated?
Not by default. For a fire separating wall you need a system tested and classified for fire resistance, installed as tested.
Do glazed panels need safety glass?
Where health or safety needs it, yes. Regulation 14 of the Workplace Regulations asks for safety material or protection against breakage, and for the glazing to be marked so it is easy to see.
Will building control need to see it?
Usually when the wall counts as building work, and not otherwise. Under regulation 3 of the Building Regulations 2010 (England and Wales) a "material alteration" is work that would leave the building failing, or failing further, on certain requirements, including structure and the fire rules on escape and internal fire spread. A partition that changes an escape route or a fire compartment can fall into that. Ask building control before you order.
How much does steel partitioning cost?
We give no rate for it: there is no published installed price per metre we can stand behind, and the skin, height, doors and glazing change the figure a lot. Installers price it on survey.
Related pages
Rules and guidance we drew on
- Regulation 14 (windows and transparent partitions) of the 1992 Workplace Regulations
- Regulation 18 (doors and gates) of the 1992 Workplace Regulations
- The Building Regulations 2010 (England and Wales), regulation 3: meaning of building work (legislation.gov.uk)
- Fire Safety Order, article 9: risk assessment (legislation.gov.uk)
- Fire safety: Approved Document B, volume 2 covers buildings other than dwellings (GOV.UK)
Get prices for a steel partition
We look for an installer who fits this kind of system near your site and tell you who they are before any of your details go to them. There is no charge to you.
Thank you. Your enquiry has reached us.
- We look for an installer who fits this kind of system in your part of the country.
- We tell you who they are. Your details only go to them if you say yes.
- They arrange a survey and send a written price. We send no marketing.