
Industrial Partitioning Company
Mesh, steel and fabric partitions for warehouses and factories, put up by an installer who works near your building.
Get a quoteWhat are you dividing off?
Four common reasons for a new wall. Each page covers the system that usually fits and the points to settle before anyone measures up.
Industrial partitions compared
What each system does once it is up. Click a system for the detail.
| System | See through | Security | Dust and noise | Fire |
|---|---|---|---|---|
| Mesh | Yes | Lockable | No help | None |
| Single skin steel | At vision panels | Lockable | Helps | Needs a tested, rated system |
| Double skin steel | At vision panels | Lockable | Helps most, cuts noise | Needs a tested, rated system |
| Fabric curtain wall | No | Low | Helps, runs to the roof | Needs a classified product |
A wall that must stop fire is its own job: see fire rated partitions.
Four things to check before a wall goes up
A partition can touch your lease, the building rules and your fire plan. None of it needs to slow the job if you ask early.
Your landlord
Your lease may restrict alterations. Where consent is needed for an improvement, section 19(2) of the Landlord and Tenant Act 1927 (England and Wales) says it cannot be unreasonably withheld.
Building control
A wall that changes an escape route, a fire compartment or the structure can be a "material alteration" under regulation 3 of the Building Regulations 2010 (England and Wales).
The fire risk assessment
New walls move the routes people take out. The responsible person reviews the assessment after a significant change (Fire Safety Order, article 9).
Doors and glazing
Glazed panels must be safety material or protected where safety needs it, and marked (Workplace Regulations, reg 14). Sliding doors need a stop against coming off the track (reg 18).
Leased unit? Our post on the licence for alterations explains how landlord consent usually works.
What a partition costs
Fabric is the only system with a published average we are happy to repeat. For mesh, single and double skin steel, insulated panel and cages, no installed rate has been published that we can stand behind, so we do not make one up. Those are priced on survey.
What you can do now is get the quantities straight. The run planner turns length, height and doors into wall area, an example panel and post count, and a fabric figure where it applies.
How a partition job usually runs
Site survey
The installer walks the floor, measures the line and notes racking, sprinklers, services and truck routes.
Layout drawing
A plan with posts, panel widths, doors and glazing, for you and your landlord to approve.
Approvals
Building control where escape or fire separation changes, and the fire risk assessment looked at again.
Install and handover
Fixed to the slab, often in phases around your shifts, with keys and records at the end.
Industrial partitioning questions
What is industrial partitioning?
Walls and screens put up inside a warehouse or factory to divide the space: welded mesh, single or double skin steel, insulated panel, or fabric curtain walls. Many are bolted to the floor, so they can usually be taken down and moved later.
Which partition should I choose?
Start with what the wall has to do. Mesh for a lockable area you can see into, solid steel to block sight and dust, double skin where noise matters, fabric for tall splits and temperature zones, and a tested fire rated system where the wall must hold back fire. The warehouse partition walls page compares them.
How much do industrial partitions cost?
A UK maker's guide from August 2024 put fabric curtain walls at about £85 per m² on average. No installed price for mesh or steel has been published that we can stand behind, so those are priced on survey. The run planner works out your quantities.
Do I need building regulations approval?
It depends on what the wall changes. Work that affects escape routes, fire compartments or structure can be a material alteration under regulation 3. A mesh store in one open area often is not. Ask building control before you order.
Is mesh partitioning fire rated?
No. Open mesh lets fire and smoke through. If the wall must hold back fire, you need a tested system, as set out on our fire rated partitions page.
Can partitions go up while the building is in use?
Usually, yes. Bolt-down systems are often fitted in phases or around shifts. Tell the installer which areas must stay running so the work can be planned around them.
Rules and guidance we drew on
- The Building Regulations 2010 (England and Wales), regulation 3 (legislation.gov.uk)
- Fire Safety Order 2005, article 9: risk assessment (legislation.gov.uk)
- Regulation 14 (transparent partitions) of the 1992 Workplace Regulations (legislation.gov.uk)
- Regulation 18 (doors and gates) of the 1992 Workplace Regulations (legislation.gov.uk)
- Landlord and Tenant Act 1927 (England and Wales), section 19 (legislation.gov.uk)
Ask for a partition quote
We look for an installer who fits this kind of system near your site and tell you who they are before any of your details go to them. There is no charge to you.
Thank you. Your enquiry has reached us.
- We look for an installer who fits this kind of system in your part of the country.
- We tell you who they are. Your details only go to them if you say yes.
- They arrange a survey and send a written price. We send no marketing.
