Skip to content
Industrial PartitioningCompanyGet a quote
Menu
A spacious empty storage building

Industrial Partitioning Company

Mesh, steel and fabric partitions for warehouses and factories, put up by an installer who works near your building.

Get a quote

Industrial partitions compared

What each system does once it is up. Click a system for the detail.

SystemSee throughSecurityDust and noiseFire
MeshYesLockableNo helpNone
Single skin steelAt vision panelsLockableHelpsNeeds a tested, rated system
Double skin steelAt vision panelsLockableHelps most, cuts noiseNeeds a tested, rated system
Fabric curtain wallNoLowHelps, runs to the roofNeeds a classified product

A wall that must stop fire is its own job: see fire rated partitions.

Four things to check before a wall goes up

A partition can touch your lease, the building rules and your fire plan. None of it needs to slow the job if you ask early.

Your landlord

Your lease may restrict alterations. Where consent is needed for an improvement, section 19(2) of the Landlord and Tenant Act 1927 (England and Wales) says it cannot be unreasonably withheld.

Building control

A wall that changes an escape route, a fire compartment or the structure can be a "material alteration" under regulation 3 of the Building Regulations 2010 (England and Wales).

The fire risk assessment

New walls move the routes people take out. The responsible person reviews the assessment after a significant change (Fire Safety Order, article 9).

Doors and glazing

Glazed panels must be safety material or protected where safety needs it, and marked (Workplace Regulations, reg 14). Sliding doors need a stop against coming off the track (reg 18).

Leased unit? Our post on the licence for alterations explains how landlord consent usually works.

About £85per m² for a fabric curtain wall, on average (August 2024 maker's guide). A guide, not a quote.

What a partition costs

Fabric is the only system with a published average we are happy to repeat. For mesh, single and double skin steel, insulated panel and cages, no installed rate has been published that we can stand behind, so we do not make one up. Those are priced on survey.

What you can do now is get the quantities straight. The run planner turns length, height and doors into wall area, an example panel and post count, and a fabric figure where it applies.

Open the run planner

How a partition job usually runs

  1. Site survey

    The installer walks the floor, measures the line and notes racking, sprinklers, services and truck routes.

  2. Layout drawing

    A plan with posts, panel widths, doors and glazing, for you and your landlord to approve.

  3. Approvals

    Building control where escape or fire separation changes, and the fire risk assessment looked at again.

  4. Install and handover

    Fixed to the slab, often in phases around your shifts, with keys and records at the end.

Industrial partitioning questions

What is industrial partitioning?

Walls and screens put up inside a warehouse or factory to divide the space: welded mesh, single or double skin steel, insulated panel, or fabric curtain walls. Many are bolted to the floor, so they can usually be taken down and moved later.

Which partition should I choose?

Start with what the wall has to do. Mesh for a lockable area you can see into, solid steel to block sight and dust, double skin where noise matters, fabric for tall splits and temperature zones, and a tested fire rated system where the wall must hold back fire. The warehouse partition walls page compares them.

How much do industrial partitions cost?

A UK maker's guide from August 2024 put fabric curtain walls at about £85 per m² on average. No installed price for mesh or steel has been published that we can stand behind, so those are priced on survey. The run planner works out your quantities.

Do I need building regulations approval?

It depends on what the wall changes. Work that affects escape routes, fire compartments or structure can be a material alteration under regulation 3. A mesh store in one open area often is not. Ask building control before you order.

Is mesh partitioning fire rated?

No. Open mesh lets fire and smoke through. If the wall must hold back fire, you need a tested system, as set out on our fire rated partitions page.

Can partitions go up while the building is in use?

Usually, yes. Bolt-down systems are often fitted in phases or around shifts. Tell the installer which areas must stay running so the work can be planned around them.

Ask for a partition quote

We look for an installer who fits this kind of system near your site and tell you who they are before any of your details go to them. There is no charge to you.

Step 1 of 3
Where is the building?
Get a quote